Yacyretá Hydroelectric Power Plant
Large-scale energy monitoring
PROJECT
Control center for real-time energy monitoring.
WHAT WE HAVE DONE
Installation of a C-CONTROL® C400 controller, collaborative videowall configuration and operational terminals in the hydroelectric power plant.
CLIENT
Yacyretá Binational Entity
DESCRIPTION
The Yacyretá Hydroelectric Power Plant required an advanced solution to more efficiently monitor the status of the dam and facilitate coordination between operators. A C-CONTROL® C400 system was implemented to manage a collaborative videowall that allows real-time visualization of key energy performance data, both in the crisis room and at the control terminals.
The solution replaced the old single-screen display, allowing for a more dynamic and shared operation.
CHALLENGES
-
Overcome visualization limitations on a single screen.
-
Provide a clear and detailed view of the operational status of the dam.
-
Coordinate information between multiple operators in real time.
-
Ensure continuity and reliability of energy monitoring.
-
Set up a collaborative environment in the crisis room and terminals.
-
Ensure an intuitive interface for daily operations control.
RESULTS
The incorporation of the C-CONTROL® C400 system transformed the operation of Yacyretá's control center. Now, operators have a collaborative videowall that centralizes critical information and allows them to make decisions based on shared data in real time.
This translates into more precise control, greater agility in energy management and a substantial improvement in internal coordination.